This study outlines the various stages involved in the MENTARI Project’s implementation of the 60 kWp and 35 kWp Solar Power Plants (PLTS), which are integrated with a Battery Energy Storage System (BESS) in the villages of Mata Redi and Mata Woga.
Synthesis Report: On Integrated 60 KWP and 35 KWP PLTS with BESS at Mata Redi and Mata Woga Project Planning and Implementation
1 file(s) 12.01 MB