This document outlines the Standard Operational Procedures (SOP) for the operation and maintenance of the 95 kWp Off-Grid Solar Power Plant System (PLTS) in Mata Redi Village, Central Sumba Regency, East Nusa Tenggara.
This document outlines the Standard Operational Procedures (SOP) for the operation and maintenance of the 95 kWp Off-Grid Solar Power Plant System (PLTS) in Mata Redi Village, Central Sumba Regency, East Nusa Tenggara.